Retaining walls · Auckland

Retaining wall builders in Auckland

Retaining walls planned around the ground, the drainage and what sits above them - new walls, failed walls and sloping sites, with the engineering and consent work handled properly.

New & replacement

Timber, concrete crib and block systems, engineered to suit the ground and the load above.

Drainage-first

Subsoil drainage and proper backfill, because most wall failures start with water.

Engineered

We work to the engineer's design and provide the records the inspection process needs.

When a wall has failed

Leaning, cracking, bulging and saturated ground behind the wall are usually what prompts the search, not a plan to build something new. If you are seeing any of these, talk to us and we will look at what is going on before recommending repair or replacement.

What we need to understand before quoting

01

Retained height

The single biggest driver. It determines the wall system, the engineering and whether consent is required.

02

What sits above the wall

A lawn is one thing. A driveway, a building or a neighbour's structure adds surcharge and changes the design.

03

Ground and slope

Soil type, fill, existing movement and how steep the ground is above and below.

04

Water

Where water comes from and where it will go. Most failed walls are drainage failures first.

05

Boundaries

Whether the wall sits on a boundary, and who it retains for.

06

Access

Whether a digger can reach the work and where excavated spoil is going.

Consent and engineering

In Auckland, retaining walls over a certain height generally require building consent, and so do lower walls that carry a surcharge from a driveway, building or slope above. Auckland Council's retaining wall guidance (practice note AC2231) sets out where the thresholds sit and when a specific engineering design is needed.

At the site visit we will tell you which category we think your wall falls into, what an engineer would need to look at, and whether a geotechnical report is likely. We will also be straight with you about the cost of that work before you commit to it. Where consent is required, we work to the engineer's design and provide the construction records the inspection process needs.

What drives cost and timing

01

Wall system and height

Timber pole, concrete crib or block, and how deep the posts or footings have to go.

02

Engineering and consent

Design fees, geotechnical input and council processing time.

03

Excavation and spoil

How much comes out, and what it costs to get off the property.

04

Drainage

Subsoil drain, filter material and where the outlet discharges to.

05

Temporary works

Holding the ground safely while the old wall is out and the new one goes in.

06

Adjacent structures

Working next to a house, a driveway or a neighbour's fence slows things down.

Retaining questions

Still have a question?Start enquiry