Decks & fencing · Auckland

Deck and fence builders in Auckland

New and replacement decks, fencing and gates across Auckland, including sloping sites and properties with difficult access. We take on full deck and fence projects - standalone, or as part of a larger renovation. Small repairs are usually better suited to a handyman than to us.

100+

Homes built — residential building experience behind every deck and fence project.

Full projects

Full deck & fence projects, standalone or delivered as part of a larger renovation.

Sloping sites

A large share of our outdoor work is on sites others turn away.

New and replacement decks

Most deck failures start underneath. We build the substructure to suit the ground and the height, then finish it so the visible parts line up.

  • Removal and disposal of an existing deck
  • Piles, bearers and joists sized for height and span
  • Timber and composite decking
  • Stairs, balustrades and handrails to code
  • Decks at floor level, including door and threshold work

Fencing and gates

Boundary and privacy fencing, built to a straight line on ground that is rarely straight. Where a fence is shared, we will tell you what usually needs agreeing with the neighbour first.

  • Timber paling, board-and-batten and slat fencing
  • Pedestrian and vehicle gates, including sliding gates
  • Fencing over undulating or sloping ground
  • Fencing on top of new or existing retaining
  • Removal and disposal of the old fence

What we assess on site

01

Area, length and height

Height above ground changes the structure, the barrier requirement and often whether consent applies.

02

Ground conditions

Clay, fill and slope all affect how the piles or posts go in.

03

Access

Whether we can get a machine to the work, or whether everything is carried by hand.

04

Demolition and disposal

What is coming out, and what condition the substructure underneath turns out to be in.

05

Materials and finish

Timber grade, composite systems, stain or oil, and hardware specification.

06

Consent and engineering

Higher decks, decks attached to the house and some retaining interfaces need approval or specific design.

Outdoor projects that cross over

A deck often needs retaining first. A fence often follows a new driveway. Where the pieces interact, doing them as one project means the levels, drainage and finished lines actually resolve.

Deck and fencing questions

Still have a question?Start enquiry

How it works

From enquiry to quote

  1. 1

    Tell us about the project

    Send details through the form or call us.

  2. 2

    Site visit

    We assess the ground, access and materials in person.

  3. 3

    Quote prepared

    Normally within around three to five business days of the visit.